Mayor Announces Bedford Town Centre Decongestion Plan, as Work Begins on Road Bridge Project

25 Jun 2014
Deputy Mayor Cllr Charles Royden and Mayor Dave Hodgson in front of the location of the planned new Bedford Town Centre bridge
Executive Member for Environment and Transport Cllr Charles Royden is working with Mayor Dave to bring forward the new Bedford Town Centre bridge linking Kingsway and River Street

Mayor Dave Hodgson has announced that work is underway on a radical Town Centre decongestion plan for Bedford Town Centre, with the construction of the Council's planned new Road Bridge over the river at its heart.

The new Town Centre Bridge, which will link Kingsway to River Street in Bedford Town Centre, has long been desired locally as a measure which would make a fundamental difference in dealing with rising traffic levels.

Mayor Dave has signalled an end to the talking and confirmed that the project is underway, kickstarted by an allocation of an initial half a million pounds for preparatory work on the design of the bridge and wider decongestion plans.

For more information and comment from Dave- please visit his website here.

This website uses cookies

Please select the types of cookies you want to allow.

These are necessary for the website to function properly.
These help us to understand how our visitors use our website.
These allow us to display content from other websites that track you for advertising purposes.